Elbphilharmonie
Hamburg / Germany

Project data

  • Small hall: Manufacture and installation of 52 G-SORBER systems; acoustic roller banners can be lowered from the ceiling from above and completely retracted into the ceiling when not in use, up to 1.7 m wide and 6.5 m high, hangings made of ABSORBER CS acoustic fabric.
  • Great Hall: Further development of the G-SORBER system - use of a worldwide new technology; production and installation of 81 motorised and variable double roller banners; acoustic roller banners are raised from the parquet floor and can also be completely lowered into the floor again, 3.0 m wide and up to 2.6 m high, hangings made of specially developed and acoustically effective fabric

General contractor
HOCHTIEF Aktiengesellschaft

Architect
Herzog & de Meuron

End customer
Elbphilharmonie Hamburg

Location
Hamburg / Germany