Project data
- Use of the inflatable bass absorbers "aQflex™" to reduce reverberation times
- Production of the projection surfaces at the side of the stage from OPTILUX material
- Unveiling curtain (24.00 m x 10.00 m) made of event textile CS Taffeta in light grey on KABUKI G2 drop system
- KING Rope Pull Track for Stage Separator Curtain
Project management
cc:blank GmbH
Customer
KRAFTWERK
Location
New National Gallery Berlin / Germany